-40%
2019 SLS Artemis-1 Pathfinder Stacking Kennedy Space Center 16 October
$ 2.11
- Description
- Size Guide
Description
SLS/Artemis-1Pathfinder Stacking
2019
Offering a cover serviced for SLS Artemis-1 Core Stage 'Pathfinder' stacking,
Cancelled Kennedy Space Center FL 16-October-2019
.
The Space Launch System (SLS) core stage pathfinder mock-up for NASA’s Space Launch System was lifted to vertical position inside the Vehicle Assembly Building (VAB) NASA’s Kennedy Space Center on October 16, 2019 by technicians using two cranes to practice critical moving, lifting and stacking maneuvers into High Bay 3 above and behind, in this view 196 ft above ground from level 16 catwalk. (Credit: Ken Kremer/kenkremer.com/spaceupclose.com)
For Non U.S. International Buyers
: Your item is normally sent by regular USPS First Class International Mail which
DOES NOT
have a Tracking Number. This provides a low-cost (.50 for up to approx. 6 items/covers) shipping cost. For high cost items the shipment will be made by USPS International First Class Package, which
HAS
a Tracking Number, the cost of which (starting at .50) and will be added to your invoice accordingly.
Due to the current worldwide health situation on mail delivery, most mail can be extremely slow, so please give delivery more time than usual.
For circumstances where mail has not been delivered requiring that I refund your payment, future mail to your address will be sent by the USPS International First Class Package rate and the amount will be added to your invoice. Whenever there is a question please contact me BEFORE bidding. Thank you for your business.